Pasco District Wood Pole Replacements (Multiple Lines) 2014 CX(s) Applied: B1.3 Date: 05/09/2014 Location(s): Washington, Washington, Oregon Offices(s): Bonneville Power Administration
North Bend District Wood Pole Replacements 2014 CX(s) Applied: B1.3 Date: 05/09/2014 Location(s): Oregon, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration
Hawkins-Alvey Line Impairment CX(s) Applied: B1.3 Date: 05/08/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Santiam Substation 230 Kilovolt Shunt Reactor Replacement CX(s) Applied: B4.11 Date: 05/05/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Slatt Substation Meter and Communication Equipment Installation CX(s) Applied: B1.7 Date: 05/05/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Fiscal Year 2014 Communication Site Engine Generator Replacements CX(s) Applied: B1.3 Date: 05/05/2014 Location(s): Oregon, Oregon, Washington, Oregon Offices(s): Bonneville Power Administration
Alfalfa Substation Control House Replacement CX(s) Applied: B4.11 Date: 05/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Celilo Converter Station Upgrades (update to previous CX issued on 7/25/13 and 3/11/14) CX(s) Applied: B4.11 Date: 04/30/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Structure and Debris Removal from Howes and Bird's Eye View Properties CX(s) Applied: B1.23 Date: 04/30/2014 Location(s): Montana Offices(s): Bonneville Power Administration
Keeler and Troutdale Substations Communication Equipment Additions CX(s) Applied: B1.7 Date: 12/30/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration