Fiscal year 2015 Wood Pole Replacements along the Libby-Bonners Ferry Transmission Line CX(s) Applied: B1.3Date: 08/10/2015 Location(s): IdahoOffices(s): Bonneville Power Administration
Forest Grove-McMinnville Wood Pole Replacement Projects CX(s) Applied: B1.3Date: 08/10/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Albany Substation Control House Floor Replacement CX(s) Applied: B1.3Date: 08/10/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Timber Tap Wood Pole Replacement Project 2015 CX(s) Applied: B1.3Date: 08/07/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Approval of Land Use Review Request for Fiber Installation in BPA right-of-way in Skamania County, Washington CX(s) Applied: B4.9Date: 08/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
North Bonneville-Ross Transmission Line Right-of-way Sale and Temporary Construction Permit - New Four Seasons Lane to 138th Ave. Segment CX(s) Applied: B1.24Date: 07/30/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Kerr Tie Line Rebuild CX(s) Applied: B4.13Date: 07/30/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Approval of Land Use Review Request for Underground Line Installation in a BPA Right-of-way in Washington County CX(s) Applied: B4.9Date: 07/30/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Mulkey Ridge Property Acquisition Funding and Stewardship Funding CX(s) Applied: B1.25Date: 07/27/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Washington County SW 124th Avenue Extension and Water Pipeline Installation CX(s) Applied: B4.9Date: 07/27/2015 Location(s): OregonOffices(s): Bonneville Power Administration