Fiber Installation at Snohomish, SnoKing and Murray Substations CX(s) Applied: B4.7 Date: 01/27/2014 Location(s): Washington Offices(s): Bonneville Power Administration
St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line CX(s) Applied: B4.11 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Ellensburg-Moxee No. 1 Right-Of-Way (ROW) Geotechnical Exploration Between Structures 17/1-22/2 CX(s) Applied: B4.7 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Franklin to Hatwai Fiber Project CX(s) Applied: B4.7 Date: 01/17/2014 Location(s): Washington, Washington, Washington, Idaho Offices(s): Bonneville Power Administration
Ross Communication Tower Fiber Installation CX(s) Applied: B4.7 Date: 01/15/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Lightspeed Network's Fiber Installation near Pilot Butte Substation CX(s) Applied: B4.7 Date: 01/15/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Longview-Cowlitz Fiber Optic Cable Upgrade CX(s) Applied: B4.7 Date: 01/06/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Revenue Meter Installation at Wind River Biomass Facility CX(s) Applied: B1.7 Date: 12/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Equipment and Property Transfers with Three Public Utilities in Oregon, Idaho and Washington CX(s) Applied: B1.124 Date: 12/26/2013 Location(s): Oregon, Idaho, Washington Offices(s): Bonneville Power Administration
Crooked Creek 3 and Deep River Mouth 2 Property Funding CX(s) Applied: B1.25 Date: 12/18/2013 Location(s): Washington Offices(s): Bonneville Power Administration