Sickler Control House Door Replacement and NERC-CIP Upgrades CX(s) Applied: B1.3Date: 08/31/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
August 31, 2016Sickler Control House Door Replacement and NERC-CIP Upgrades
CX(s) Applied: B1.3
Date: 08/31/2016
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to perform North American Electric Reliability Corporation’s Critical Infrastructure Protection (NERC-CIP) upgrades to the front door of the Sickler Substation control house.