Troy Substation Tap Yard Expansion CX(s) Applied: B4.11Date: 07/14/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Acquisition of Multiple Access Road Easements for the Holcomb-Naselle No. 1 Transmission Line CX(s) Applied: B1.42Date: 07/09/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Washougal Vegetative Maintenance - LURR 20150160 CX(s) Applied: B4.9Date: 07/08/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Rainbow Farms Property Acquisition Funding and Stewardship Funding CX(s) Applied: B1.25Date: 07/08/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Wood Pole Replacements on Salem-Grand Ronde #1 & Grand Ronde-Boyer #1 Transmission Line Corridor CX(s) Applied: B1.3Date: 07/08/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Kalispell-Kerr No. 1 Transmission Line Access Road Improvements CX(s) Applied: B1.3Date: 07/06/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Malin-Hilltop #1 Wood Pole Replacement CX(s) Applied: B1.25Date: 07/02/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Chenoweth Substation Water and Sewer Connection CX(s) Applied: B1.3Date: 07/02/2015 Location(s): CaliforniaOffices(s): Bonneville Power Administration
Longview Osmose 2015 Corrosion Mitigation and Repair Project CX(s) Applied: B1.3Date: 07/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Albany-Eugene No. 1 Nesting Platform Relocation CX(s) Applied: B4.6Date: 07/01/2015 Location(s): OregonOffices(s): Bonneville Power Administration