CX-015256: Categorical Exclusion Determination

Raver-Paul Insulator Replacement Project CX(s) Applied: B1.3Date: 42569 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

July 18, 2016
Estimated Read Time   min

Raver-Paul Insulator Replacement Project
CX(s) Applied: B1.3
Date: 42569
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration proposes to replace deteriorating transmission line insulator assemblies and associated hardware at the 32 locations listed in the table below.