Verizon Franklin Park Wireless Installation CX(s) Applied: B1.19Date: 05/02/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Grandview Substation Upgrades CX(s) Applied: B4.1Date: 05/02/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Boardman-Lone Number 1, Franklin-Walla Walla Number 1, Grandview-Red Mountain Number 1 and McNary-Roundup Number 1 Wood Pole Replacement CX(s) Applied: B1.3Date: 42492 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Alcoa Power Sales Contract Amendment No.3 CX(s) Applied: B4.1Date: 04/26/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
Anaconda Substation Control House Floor Asbestos Abatement CX(s) Applied: B1.16Date: 04/25/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
Echo Lake-Maple Valley No.1 Footing Repair Project: Structure 10/2 CX(s) Applied: B1.3Date: 04/22/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Jocko Hollow Property Acquisition Funding CX(s) Applied: B1.25Date: 04/22/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
Hat Rock Substation Upgrades CX(s) Applied: B4.1Date: 04/22/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Grandview-Red Mountain #1 Wood Pole Replacement CX(s) Applied: B1.3Date: 04/20/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration