Centipede Creek Property Acquisition Funding CX(s) Applied: B1.25Date: 04/20/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
Fiscal Year 2016 Wood Pole Replacement – Grand Coulee Transmission Line Maintenace CX(s) Applied: B1.3Date: 04/19/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Addy-Cusick No. 1 Mile 20 to 22 Road Improvement & Ford Construction CX(s) Applied: B1.3Date: 04/18/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Fairview-Bandon No. 1 Span 12/2 Impairment Remedy CX(s) Applied: B1.3Date: 04/15/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Marion-Alvey Transmission Line Mile 1-43 Access Road Upgrade Project CX(s) Applied: B1.3Date: 04/14/2016 Location(s): OregonOffices(s): Bonneville Power Administration
ELI Fiber Splicing Project at Salem Substation CX(s) Applied: B4.9Date: 04/12/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Big Eddy-Redmond Transmission Wood Pole Replacement CX(s) Applied: B1.3Date: 04/12/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
National Oceanographic and Atmospheric Administration Sockeye Salmon Captive Broodstock Program Routine Maintenance CX(s) Applied: B1.3Date: 04/06/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Installation of Metering Equipment near North Bench and Bonners Ferry Substations CX(s) Applied: B4.9Date: 04/01/2016 Location(s): IdahoOffices(s): Bonneville Power Administration
Kitts Corner Wireless Communication Facility CX(s) Applied: B1.19Date: 03/31/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration