Categorical Exclusion Determination
Office of NEPA Policy and Compliance
January 3, 2017Bonneville Power Administration proposes to fund the installation of a new outdoor tank area, construction of four new 30-foot diameter dual drain circular tanks, a pre-engineered metal roof cover over the tanks that is enclosed with predator barriers, water supply and drain piping, water aeration equipment, a low pressure air blower and delivery system, aero boost water recirculation equipment, instrumentation, and associated electrical power, lighting, and outlets to facilitate tank operation. Associated work includes but is not limited to the excavation, CX: Backfill, trenching, asphalt patching, electrical, piping, pipe fittings, and valves for a complete and operational circular tank with water reuse project.