Teton to Targhee Fiber Communication Project CX(s) Applied: B4.7Date: 09/13/2016 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 13, 2016Teton to Targhee Fiber Communication Project
CX(s) Applied: B4.7
Date: 09/13/2016
Location(s): Multiple Locations
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to create a fiber optic connection between its Teton and Targhee Substations by leasing existing available fiber optic cable from Silver Star Communication.