Osmose Treatment Pilot Project to Inspect and Repair Steel Tower Legs CX(s) Applied: B1.3Date: 10/14/2016 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

October 14, 2016
Estimated Read Time   min

Osmose Treatment Pilot Project to Inspect and Repair Steel Tower Legs
CX(s) Applied: B1.3
Date: 10/14/2016
Location(s): Multiple Locations
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) is proposing to conduct an inspection, repair, and treatment project at 19 steel-lattice structure sites on nine different transmission lines.