CX-015762: Categorical Exclusion Determination

Big Eddy-Chemoweth No. 2 Impairment Remedies- Updated Scope of Work CX(s) Applied: B1.3Date: 09/30/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

September 30, 2016
Estimated Read Time   min

Big Eddy-Chemoweth No. 2 Impairment Remedies- Updated Scope of Work
CX(s) Applied: B1.3
Date: 09/30/2016
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to perform work at seven locations along approximately 3.3 miles of the Big Eddy-Chenoweth No. 2 230 kilovolt transmission line.

Document(s) Available for Download