B903 Renovation CX(s) Applied: B1.16, B1.29, B2.1, B2.5 Date: 04/10/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Installation of Power Rack in Blast Resistant Enclosures (BREs) 3 Through 8 CX(s) Applied: B2.1 Date: 03/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Energy Efficiency and Conservation Block Grant- City Hall Heating and Cooling CX(s) Applied: A9, A11, B1.32, B1.35, B2.1, B2.2, B5.1 Date: 01/24/2013 Location(s): North Dakota Offices(s): Golden Field Office
Power to H-1Y Laydown Yard CX(s) Applied: B2.1 Date: 01/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Geothermal Retrofit of Illinois National Guard's State Headquarters Building CX(s) Applied: A9, B2.1, B5.19 Date: 01/14/2013 Location(s): Illinois Offices(s): Golden Field Office
Washington River Protection Solutions LLC - Workplace Enhancements CX(s) Applied: B2.1 Date: 12/18/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Loan Loss Reserve CX(s) Applied: A9, A11, B1.32, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19 Date: 12/12/2012 Location(s): Hawaii Offices(s): Golden Field Office
Maintenance Activities CX(s) Applied: B1.3, B1.27, B2.1, B2.2, B2.3, B5.1 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office
Ventilation Activities CX(s) Applied: B1.4, B1.16, B2.1, B2.3 Date: 11/19/2012 Location(s): Tennessee, California, California, Virginia Offices(s): Oak Ridge Office
Y646 (Y189), Renovation of E-Wing Ventilation, Building 773-A CX(s) Applied: B2.1 Date: 11/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office