Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace the heating, ventilation, and air conditioning (HVAC) sy…
The Central Alarm Station (CAS) is important for safe and effective operation of the Bettis Site. The CAS houses servers, computers, and monitoring equipment associated with systems to ensure safe operations.
The Effluent Treatment Facility (ETF) Laboratory heating, ventilation, and air conditioning system needs to be permanently replaced due to its age …
Replacement of lighting to take place at 736-A in rooms 101-A, 102, 124, 126, 129, 130, 131, 131-A, 132, 133, 134, 135, 136, 136-A, and 143 thru 15…
Personnel Gate installation between 705-K and 717-K.…
The breathing air egress manifold will be replaced to increase flow capacity of the H Canyon Egress system. This will increase the reliability and …
The U.S. Department of Energy's (DOE) National Laboratory of the Rockies (NLR) is proposing to partner with the Department of Defense (DoD) to inst…
This categorical exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform modifications within or contiguous to an existing structure, in a pre…