Replace the chiller and supporting mechanical equipment, including rooftop condensers, evaporators, and associated compressors, chiller water chemi…
Removal of old asphalt roofing shingles and the installation of new asphalt shingles.…
This project will consist of the purchase and installation of a dual-fired, natural gas and hot water, double stage absorption chiller.…
The project will create a hub of readily available, easy-to-access, inventory of essential equipment that otherwise has long lead times to be able …
The U.S. Department of Energy (DOE) is proposing to provide funding to Allegheny County to install new electrical services and upgrade existing lig…
The L-Area Emergency Basin needs some additional electrical receptacles to support the Accelerated Basin Deinventory (ABD) Project.…
This EEC addresses planned renovation activities within 704-L.…
Replace Light Emitting Diode (LED) Lamps with High Pressure Sodium (HPS) Lamps in the Defense Waste Processing Facility (DWPF) Canyon.…
Installation of a Ductless Mini-Split HVAC system to provide supplemental cooling for the reception area located in the National Security Study Bui…
Prepare M-TMOD-S-00007 210-S HVAC System for relocation to 210-S Roof. Remove existing OOS HVAC unit S210-545-020-00VH from 210-S Roof. Relocate M-…