Replace HVAC unit in 105-K MAC due to age, wear and tear.…
Airborne dust enters Building 218-1H through the five wall air intake louvers, which are not equipped with filters. The transport of this airborne …
The 735-4B exterior light fixtures have been experiencing increasing reliability issues and recent safety concerns have been raised by the building…
Renovation of PGH B-921 and/or MGN B-26 3rd floor to refresh outdated office spaces to support and enhance NETL's workplace improvement strategies.…
PMCS to re-lamp all fluorescent non-emerg. lights. Replace with UL A B bulbs in bldgs. 730-4B/703-46A/703-47A/719-5N.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform modifications within or contiguous to an existing structure, in a pre…
The U.S. Department of Energy (DOE) is proposing to provide funding to Winnett School District No. 1 (hereinafter "Winnett") to perform energy effi…
Utilize an existing lab space to create a hub for battery manufacturing research and education.…
Renovate 784-3A restroom.…