The Saltstone Process Room ventilation is a once-through system not designed for continuous personnel occupation.…
Purpose: To ensure the safety and reliability of the bulk electric system.…
Two space heaters will be removed from the transfer bay and be disposed of.…
HVAC installed incorrectly. Odor being introduced into the building from recent roof renovations…
Provide Power to Buildings 706-H, 706-8H and 706-6H.…
New lighting is to be installed in Cylinder Storage Building 734-Z.…
Modification, alteration, maintenance, paving and striping of the gravel overflow parking lot in SWPF.…
Maintenance, repairs, renovations, and upkeep will focus on these systems: plumbing, building envelope, electrical, telecommunication, and research…
Renovation length of old high-pressure propane pipe in 773-2A cylinder shed and 773-A glass shop (D-0101).…
The U.S. Department of Energy (DOE) is proposing to repurpose the remaining amount of American Recovery and Reinvestment Act (ARRA) funds (approxim…