The HMI ("Signal" software running on Windows 7 PC) for the HVAC system at the 2H control room building is obsolete and unreliable. This HMI platfo…
The disconnect in Air Handling Unit number 7 will be replaced. The work will be performed by F-Area Complex E and I.…
Remodel 713-N Room 7and new HVAC Installation for Building 713-N Room 7…
Remodel to provide new plumbing, electrical, HVAC, fire protection, egress, asbestos remediation, and historic windows.…
Proposed activities would include administrative records storage and maintenance and routine operations and maintenance of equipment and assets.…
Remove wall and install a security door in 713-N.…
Remodel to provide new plumbing, electrical, HVAC, fire protection, egress, asbestos remediation, and historic windows.…
Renovate interior at 284-19H and 284-20H.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to SOLARCYCLE, Inc. (SC) to enhance photovoltaic (PV) recycling capabil…