The entire 3-story, 32,355 square feet, building interior will be reconfigured to serve as a training facility to meet current and upcoming functional needs.
The U.S. Department of Energy’s (DOE) National Renewable Energy Laboratory proposes to remove razor wire and repair green screen fencing at NREL’s …
Cooling Oasis with Installed Fire Protection in 163-70K.…
This change package is to extend Tank 32 purge fan stack to an elevation of 35 feet.…
Bonneville Power Administration (BPA) proposes to clean-up bat and rodent biomass for example, bat guano, rodent feces, expired animals, etc.) from…
Provide improvements to the site main entry to the site, including driveway widening, replacement of sidewalk and curbs, additional parking spaces,…
Refurbish the 105-L 15 Womens and Mens Restrooms and Refurbish 105-L level 0 Women's and Men's Restrooms and Women's Restrooms.…
Modification of Test Console Vent Piping in 221-33F.…
Vendor will install bottle filling water stations near the kitchens on the second and third floors of 730-4B.…
Airborne dust enters Building 218-1H through the five wall air intake louvers, which are not equipped with filters.…