The scope of the Warehouse Upgrade Project includes demolition of the concrete floor slab to install plumbing piping and minor interior demolition.
Replace fuel oil heater No. 45 in building 717-3N and abandon in place existing unit No. 47.…
SRNL will receive a variety of routine samples from the Actinide Removal Process (ARP) and the Modular Caustic Side Solvent Extraction Unit (MCU) (…
Upgrade K-Reactor Building Plus 15 Level Lunch Room…
Upgrade aging electrical infrastructure in the B28 electrical vault to address clearance and arc flash issues, bring vault into code compliance wit…
The proposed action would permit routine maintenance and minor upgrades to existing Brookhaven National Laboratory facilities.…
Replace 736-A HVAC per E-SOW-A-00138 and M-SOW-A-00189.…
Add redundant HVAC system in building 623-40G.…
Remove exterior awning and install new Carrier 20-Ton HVAC Unit at building 725-2N (Paint Barn).…
Replace the current out-dated HVAC unit at building 717-10N with a new unit.…