A new HVAC system will be added at Building 709-1G for eventual replacement of the existing system that does not provide adequate service to the bu…
This EEC will cover the replacement of two HVAC systems located in 735-A Section-B record storage repository rooms 123 and 125.…
The 235-H Conference Room (Room 121) current HVAC supply is inadequate when the room is at medium to full capacity.…
Install 2 new fuel oil heaters in building 711-N (the Iron Workers shop area).…
Retrofit 4 lights in building221-33F with LED retrofit kits.…
Troubleshoot and Repair indoor lights at 704-N.…
INL needs to manage facilities and property in a safe, secure, cost-effective, and sustainable manner to ensure assets are available, utilized, and…
Repair fire/water damage in the high-bay area and portions of the attic and roof in Building 28.…
There are currently employees stationed at the 263-170H warehouse, which does not have any form of air conditioning.…
The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a…