Install new equipment (HVAC unit and Ice maker) at 725-1N.…
National Nuclear Security Administration’s proposed action is to perform the necessary and routine analytical laboratory operation, research and de…
National Nuclear Security Administration’s (NNSA) proposed action is to perform the necessary and routine personnel safety enhancements and safety …
National Nuclear Security Administration’s (NNSA) proposed action is to perform the necessary and routine administrative actions, training exercise…
Demolish existing corrugated metal roof and replace wood battens as necessary. Install new insulated metal roofing panels, eaves, fascia, and gutte…
A-786005-HVAC-ACU-1 and A-786005-HVAC-ACU-2 are scheduled for replacement due to age and degradation.…
This ECP is for the remodel of the former MFC-752 cafeteria. In FY-21, the MFC Cafeteria was relocated from MFC-752 to MFC-1747.…
The scope of the Warehouse Upgrade Project includes demolition of the concrete floor slab to install plumbing piping and minor interior demolition.
Replace fuel oil heater No. 45 in building 717-3N and abandon in place existing unit No. 47.…
SRNL will receive a variety of routine samples from the Actinide Removal Process (ARP) and the Modular Caustic Side Solvent Extraction Unit (MCU) (…