The project has decided that the use of pole-mounted fiber is better suited for the area.…
Install a pressure reducing valve in both Inert Load Lines in accessible locations that allow the operator to monitor delivery gas pressure and loa…
Refurbish 105-L 15 Men's and Women's Restrooms…
Modification of Test Console Vent Piping in 221-33F.…
Renovate the bathrooms and change rooms in 704-L.…
In Building 717-8N, reconfigure section of exhaust trunkline ductwork and install new duct from reconfigured trunkline to Powermatic Disc Sander to…
Remove existing HVAC Unit No. 3 from building 717-5N and replace with a new 5-ton Carrier heat-pump package unit.…
773-52A Install bottle filling station.…
Installation of a A Ductless Mini-Split HVAC system to provide supplemental cooling for building 730-A room 167.…
Partial D and R of water wall (shielding) in DBCF and install redesign (TBD) for more efficient access.…