773-52A Install bottle filling station.…
Installation of a A Ductless Mini-Split HVAC system to provide supplemental cooling for building 730-A room 167.…
Partial D and R of water wall (shielding) in DBCF and install redesign (TBD) for more efficient access.…
Install new equipment (HVAC unit and Ice maker) at 725-1N.…
National Nuclear Security Administration’s proposed action is to perform the necessary and routine analytical laboratory operation, research and de…
National Nuclear Security Administration’s (NNSA) proposed action is to perform the necessary and routine personnel safety enhancements and safety …
National Nuclear Security Administration’s (NNSA) proposed action is to perform the necessary and routine administrative actions, training exercise…
Demolish existing corrugated metal roof and replace wood battens as necessary. Install new insulated metal roofing panels, eaves, fascia, and gutte…
A-786005-HVAC-ACU-1 and A-786005-HVAC-ACU-2 are scheduled for replacement due to age and degradation.…
This ECP is for the remodel of the former MFC-752 cafeteria. In FY-21, the MFC Cafeteria was relocated from MFC-752 to MFC-1747.…