The Saltstone Process Room Ventilation comfort cooling design is not adequate during periods that personnel are in the Saltstone Process Room perfo…
Extend the purge exhaust stack to a minimum height of 60 feet above the tank top.…
D and R the 234-H tankless water heater in the kitchen and run an insulated domestic water line from the existing 234-H men's restroom water heater…
The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a…
Dismantle and remove existing Air Handling Unit (AHU) A-773000-HVAC-AHU-2909029B, and Air-Cooled Condensing Unit (ACCU) A-773000-HVAC-CDU-209019B.…
Remove exterior awning and install new Carrier 20-Ton HVAC Unit at building 725-2N (Paint Barn).…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remodel the existing first floor women’s and men’s restrooms, ad…
Remodel the B17 Central High Bay area to provide updated offices with new furniture, doors, fire suppression system, new infrastructure, new HVAC, …
Remove existing water fountains and replace with hands free water dispensers in Buildings 717-F, 705-3C, 705-C, 704-1N,719-5N, and 704-3N.…
MSA/HMIS to perform modifications within or contiguous to an existing structure, in a previously disturbed or developed area, to enhance workplace …