Renovation of restroom in Building 751-1A.…
The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a…
This work will replace existing HVAC systems located in building 735-7A due to the age and the condition of the equipment.…
Remove the end of life asphalt roof shingles, overlay existing wood deck, and install new 35-year asphalt shingles.…
Install two wall mounted HVAC units, or engineering approved equal, and any supporting electrical outlets or power sources.…
The Princeton Plasma Physics Laboratory's (PPPL) proposed Critical InfrastructureRecovery and Renewal (CIRR) project would replace old, degraded sy…
Remove the end of life asphalt roof shingles, overlay existing wood deck with 0.5" plywood, and install new 35 year asphalt shingles.…
CX-021156: Roof Replacements and Thermal Performance Improvements at Garrison and Keeler Substations
Bonneville Power Administration (BPA) is proposing to conduct activities to improve thermal efficiency and moisture retention in buildings at two B…
This activity will upgrade the H Canyon north end elevator.…
The Mission Support Contractor (MSC) and its subcontractors perform modifications within or contiguous to an existing structure, in a previously di…