Remove exterior awning and install new Carrier 20-Ton HVAC Unit at building 725-2N (Paint Barn).…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remodel the existing first floor women’s and men’s restrooms, ad…
Remodel the B17 Central High Bay area to provide updated offices with new furniture, doors, fire suppression system, new infrastructure, new HVAC, …
Remove existing water fountains and replace with hands free water dispensers in Buildings 717-F, 705-3C, 705-C, 704-1N,719-5N, and 704-3N.…
MSA/HMIS to perform modifications within or contiguous to an existing structure, in a previously disturbed or developed area, to enhance workplace …
The flooring in 704-72S in the women's restroom has become saturated and is peeling up due to flooding issues in the past.…
Demolish current flooring, remove old fixtures/utilities, install new flooring, install new HVAC system, install new fire suppression system, and i…
The Missouri University of Science and Technology (Missouri S
This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste
The proposed modification is to alter Replacement Tritium Facility (RTF or building 233-H) Electrical Control Room (ECR or room 8) supply andexhaus…