This NEPA document would be considered an "umbrella" document for Pantex Plant projects pertaining to safety, health, and environmental improvement…
The Department of Energy intends to fund operation and maintenance actions at the Sanford Underground Research Facility (SURF). Actions would be bo…
Award Number: DE-EE0006926, CXs Applied: A9, A11, B1.31, B2.1, B3.6, B3.15, Advanced Manufacturing Office, Location: TN, Office: Golden Field Office
Install a new code and ADA compliant sidewalk on the North Side of Building 1. …
The project includes replacement of the Firing Range ventilation system, replacement of the roof membrane to eliminate entry of precipitation into …
Improve work conditions inside 511-S for outage and project construction activities supporting the Salt Waste Processing Facility tie-ins by instal…
Re-roof B23.…
Install a new HVAC system in the L-Area Disassembly / Transfer Bay Area to provide adequate cooling for personnel comfort.…
Install two new packaged HVAC units at +34' level of L-Area Complex to provide personnel heating & cooling at +15' level to replace CHU-1 and assoc…
There are currently employees stationed at the 263-170H warehouse, which does not have any form of air conditioning. Swamp coolers are currently us…