The Department of Energy intends to fund operation and maintenance actions at the Sanford Underground Research Facility (SURF). Actions would be bo…
Award Number: DE-EE0006926, CXs Applied: A9, A11, B1.31, B2.1, B3.6, B3.15, Advanced Manufacturing Office, Location: TN, Office: Golden Field Office
Install a new code and ADA compliant sidewalk on the North Side of Building 1. …
The project includes replacement of the Firing Range ventilation system, replacement of the roof membrane to eliminate entry of precipitation into …
Improve work conditions inside 511-S for outage and project construction activities supporting the Salt Waste Processing Facility tie-ins by instal…
Re-roof B23.…
Install two new packaged HVAC units at +34' level of L-Area Complex to provide personnel heating & cooling at +15' level to replace CHU-1 and assoc…
Install a new HVAC system in the L-Area Disassembly / Transfer Bay Area to provide adequate cooling for personnel comfort.…
There are currently employees stationed at the 263-170H warehouse, which does not have any form of air conditioning. Swamp coolers are currently us…
Remove existing temporary scaffold-style handrail and replace with a permanent handrail.…