The objective of this work is to remodel the existing INTEC CAS CPP-1674 with updated security CAS equipment and consoles.…
BPA proposes to replace the roof and siding of the pre-engineered metal control house at the Wendson Substation.…
The old HVAC unit will be swapped out with necessary modifications to make the room usable with the new CT scanner.…
Replace and reconfigure cubicles in building 248-H per Design Change Package, E-DCP-H-19008, to allow for additional personnel in the building.…
Replace and remove lighting fixture for outside roof lights on 292-2F with LED upgrade.…
Replacing damaged sections of sidewalk and asphalt paving on site.…
Replacement of 70-Ton Chiller Building 234-H Room 330…
Renovation of restroom in Building 751-1A.…
The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a…
This work will replace existing HVAC systems located in building 735-7A due to the age and the condition of the equipment.…