Improve work conditions inside 511-S for outage and project construction activities supporting the Salt Waste Processing Facility tie-ins by instal…
Re-roof B23.…
Install two new packaged HVAC units at +34' level of L-Area Complex to provide personnel heating & cooling at +15' level to replace CHU-1 and assoc…
Install a new HVAC system in the L-Area Disassembly / Transfer Bay Area to provide adequate cooling for personnel comfort.…
There are currently employees stationed at the 263-170H warehouse, which does not have any form of air conditioning. Swamp coolers are currently us…
Remove existing temporary scaffold-style handrail and replace with a permanent handrail.…
2 HVAC units with excessive service calls past their expected life cycle will be replaced with better up to date equipment.…
Remove 8 small hotel unit HVACs, replace with DOAS system or similar via design build.…
Unit needs resized/replaced.…
Install a new HVAC system and evacuate refrigerant from existing HVAC system at 736-A. The Existing HVAC system serving the Temperature & Force Cal…