Remodel the 1st and portions of the 2nd floors of B17 East Wing to provide updated offices with new furniture, doors, and fire suppression system, …
Replace existing B-84 Summer Boiler and associated pumps and controls.…
INL upgrades, remodels, repairs, and replaces facility and equipment components, assemblies, and systems on a continual basis to support the needs …
The objective of this work is to remodel the existing INTEC CAS CPP-1674 with updated security CAS equipment and consoles.…
BPA proposes to replace the roof and siding of the pre-engineered metal control house at the Wendson Substation.…
The old HVAC unit will be swapped out with necessary modifications to make the room usable with the new CT scanner.…
Replace and reconfigure cubicles in building 248-H per Design Change Package, E-DCP-H-19008, to allow for additional personnel in the building.…
Replace and remove lighting fixture for outside roof lights on 292-2F with LED upgrade.…
Replacing damaged sections of sidewalk and asphalt paving on site.…
Replacement of 70-Ton Chiller Building 234-H Room 330…