Install 2 new fuel oil heaters in building 711-N (the Iron Workers shop area).…
Retrofit 4 lights in building221-33F with LED retrofit kits.…
Troubleshoot and Repair indoor lights at 704-N.…
INL needs to manage facilities and property in a safe, secure, cost-effective, and sustainable manner to ensure assets are available, utilized, and…
Repair fire/water damage in the high-bay area and portions of the attic and roof in Building 28.…
There are currently employees stationed at the 263-170H warehouse, which does not have any form of air conditioning.…
The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a…
Replace high-bay lights with LEDs and remove the roll-up door motor at 725-2N.…
Replace lights with LEDs at 711-6N.…
Replace light ballasts in room 400 at 704-4N.…