The L-Area Emergency Basin needs some additional electrical receptacles to support the Accelerated Basin Deinventory (ABD) Project.…
This EEC addresses planned renovation activities within 704-L.…
Replace Light Emitting Diode (LED) Lamps with High Pressure Sodium (HPS) Lamps in the Defense Waste Processing Facility (DWPF) Canyon.…
Installation of a Ductless Mini-Split HVAC system to provide supplemental cooling for the reception area located in the National Security Study Bui…
Prepare M-TMOD-S-00007 210-S HVAC System for relocation to 210-S Roof. Remove existing OOS HVAC unit S210-545-020-00VH from 210-S Roof. Relocate M-…
Replace FOS 18 Backup HVAC Unit S-980000-HVAC-AHU-980530605-00VH with a split system using R-454B refrigerant or equivalent.…
Replace two backup HVAC units, S-221000-HVAC-AHU-390565085-00VH and S-221000-HVAC-AHU-3905650095-00VH. Replace units with packaged units similar in…
Replace 221-S Mezzanine Counting Room Air Conditioning Unit…
Replace HVAC unit in 105-K MAC due to age, wear and tear.…
Airborne dust enters Building 218-1H through the five wall air intake louvers, which are not equipped with filters. The transport of this airborne …