CX-270095: Test Reactor Area (TRA)-670 Control Room Break Room and 2nd Basement Bathroom Modification

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

January 18, 2016
Estimated Read Time   min

The sewer system associated with the TRA-670 2nd basement restroom does not work properly. The piping leaks, does not drain properly, and sewer gas odor is present. To fix this, the sewer system has been re-designed to have the proper number of vents, piping size, and functioning components. The scope of this modification would include removal and replacement of the sink, toilet, sewer piping, ventilation piping, veneer on the restroom walls, and fire sprinkler head.