Safety, Health, and Environmental Improvements for FY2014 and FY2015 CX(s) Applied: B2.1, B2.2, B2.3, B2.5 Date: 09/26/2013 Location(s): Texas Offices(s): Pantex Site Office
Buildings 7-11 Sidewalk Replacement CX(s) Applied: B1.15, B2.1, B2.5 Date: 09/11/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Building 3 Heating, Ventilation and Air Conditioning Improvements CX(s) Applied: B2.1, B2.5 Date: 08/29/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Building 4 Lead Paint Abatement & Repainting CX(s) Applied: B2.1, B2.5 Date: 08/13/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Building 58 Third Floor Mezzanine Enclosure CX(s) Applied: B2.1, B2.2, B2.3 Date: 07/25/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
NETL Morgantown Pavilion CX(s) Applied: B1.13, B2.1 Date: 07/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Building 4 Ventilation Upgrades CX(s) Applied: B2.1, B2.5 Date: 07/17/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Install Air Conditioning in the Fuel Manufacturing Facility (FMF) (Materials and Fuel Complex [MFC]-704) Security Police Officer (SPO) Office CX(s) Applied: B2.1 Date: 07/17/2013 Location(s): Idaho Offices(s): Nuclear Energy
Pittsburgh Site Wide Exterior Door Repair/Replacement Project CX(s) Applied: B2.1, B2.5 Date: 07/17/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh Building 65 and Building 74 Loading Dock Railing Project CX(s) Applied: B2.1, B2.3 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory