Categorical Exclusion Determination
Office of NEPA Policy and Compliance
April 26, 2016This Environmental Checklist (EC) is being revised to add additional scope to include disconnecting and removing the drinking fountain outside the east door to the Advanced Test Reactor (ATR) Process Control Room. Both the potable water supply line and the cold waste drain will remain in place but will be capped.