Install New Heating, Ventilation, and Air Conditioning System for L-Area Disassembly CX(s) Applied: B2.1Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
K-Area Security Ready Room Additional Heating, Ventilation, and Air Conditioning Units CX(s) Applied: B2.1Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
New Heating, Ventilation, and Air-Conditioning System for L-Area Complex CX(s) Applied: B2.1Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Categorical Exclusion Determination
Categorical Exclusion Determination
CX-270227: Upgrade Willow Creek Building (WCB) (Idaho Falls [IF]-616) Room 240B Sound Barrier Rating
Categorical Exclusion Determination
Materials and Fuels Complex (MFC)-752 Analytical Laboratory Installation of Air Conditioning Units CX(s) Applied: B2.1Date: 08/04/2016 Location(s): IdahoOffices(s): Nuclear Energy
Categorical Exclusion Determination
2016 Materials and Fuels Complex (MFC) Campus Improvement Projects CX(s) Applied: B2.1Date: 07/25/2016 Location(s): IdahoOffices(s): Nuclear Energy
Idaho Falls (IF)-616 Willow Creek Building (WCB) Room 184/187 Office Suite Remodel CX(s) Applied: B2.1Date: 07/20/2016 Location(s): IdahoOffices(s): Nuclear Energy