Replace/Upgrade 670-HVA-3, Process Control Room Air Conditioner CX(s) Applied: B2.1Date: 42472 Location(s): IdahoOffices(s): Nuclear Energy
Office of NEPA Policy and Compliance
April 12, 2016Replace/Upgrade 670-HVA-3, Process Control Room Air Conditioner
CX(s) Applied: B2.1
Date: 42472
Location(s): Idaho
Offices(s): Nuclear Energy
This Environmental Checklist (EC) is being revised to add additional scope to include disconnecting and removing the drinking fountain outside the east door to the Advanced Test Reactor (ATR) Process Control Room. Both the potable water supply line and the cold waste drain will remain in place but will be capped.