Replace/Upgrade 670-HVA-3, Process Control Room Air Conditioner CX(s) Applied: B2.1Date: 42472 Location(s): IdahoOffices(s): Nuclear Energy

Office of NEPA Policy and Compliance

April 12, 2016
Estimated Read Time   min

Replace/Upgrade 670-HVA-3, Process Control Room Air Conditioner
CX(s) Applied: B2.1
Date: 42472
Location(s): Idaho
Offices(s): Nuclear Energy

This Environmental Checklist (EC) is being revised to add additional scope to include disconnecting and removing the drinking fountain outside the east door to the Advanced Test Reactor (ATR) Process Control Room. Both the potable water supply line and the cold waste drain will remain in place but will be capped.