Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1 Date: 09/21/2012 Location(s): Grand Junction Offices(s...
Pittsburgh B84 Roof Fall Protection CX(s) Applied: B2.1, B2.3 Date: 09/21/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Big 8 - 922, 920, 921 Heating, Ventilation and Air Conditioning Upgrades; 921, 74 Roof Replacement; HPSB Upgrades CX(s) Applied: B2.1, B2.2, B2.3 Date: 09/07/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Project Z-064, Waste Sampling and Characterization Facility Heating, Ventilation, and Air Conditioning System Upgrade CX(s) Applied: B2.1 Date: 09/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
B-22A Renovation CX(s) Applied: B1.4, B1.7, B1.15, B1.23, B2.1, B2.3, B2.5 Date: 08/31/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
B17 Roof Replacement & Painting CX(s) Applied: B1.23, B2.1, B2.5 Date: 08/30/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Pittsburgh B83 Boiler Room Ventilation/Cooling Project CX(s) Applied: B2.1, B2.2, B2.3 Date: 08/29/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Hydrogen Fuel-Cell Electric Hybrid Truck Demonstration CX(s) Applied: B2.1, B5.1, B5.22 Date: 08/29/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Building 29-31 Internal Electrical Upgrades CX(s) Applied: B2.1, B2.5, B4.6 Date: 08/20/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Recovery Act State Energy Program Award for the State of Ohio - Revolving Loan Fund CX(s) Applied: A9, A11, B1.31, B1.32, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19 Date: 08/13/2012 Location(s): Ohio Offices(s): Golden Field Office