Categorical Exclusion Determinations: B2.1

Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1 Date: 09/21/2012 Location(s): Grand Junction Offices(s...
Big 8 - 922, 920, 921 Heating, Ventilation and Air Conditioning Upgrades; 921, 74 Roof Replacement; HPSB Upgrades CX(s) Applied: B2.1, B2.2, B2.3 Date: 09/07/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Project Z-064, Waste Sampling and Characterization Facility Heating, Ventilation, and Air Conditioning System Upgrade CX(s) Applied: B2.1 Date: 09/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Pittsburgh B83 Boiler Room Ventilation/Cooling Project CX(s) Applied: B2.1, B2.2, B2.3 Date: 08/29/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory