Categorical Exclusion Determinations: B2.1

Project Z-064, Waste Sampling and Characterization Facility Heating, Ventilation, and Air Conditioning System Upgrade CX(s) Applied: B2.1 Date: 09/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Pittsburgh B83 Boiler Room Ventilation/Cooling Project CX(s) Applied: B2.1, B2.2, B2.3 Date: 08/29/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Recovery Act State Energy Program Award for the State of Ohio - Revolving Loan Fund CX(s) Applied: A9, A11, B1.31, B1.32, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19 Date: 08/13/2012 Location(s): Ohio Offices(s): Golden Field Office
Recovery Act: Hybrid Ground Source Heat Pump System in Tennessee K-12 Schools CX(s) Applied: A9, B2.1, B5.19 Date: 07/19/2012 Location(s): Tennessee Offices(s): Golden Field Office
Utility Energy Service Contract Closed Loop Centrifugal Chiller at the Central Chilled Water Facility CX(s) Applied: B1.5, B2.1 Date: 07/10/2012 Location(s): New York Offices(s): Brookhaven Site Office