NETL Morgantown Pavilion CX(s) Applied: B1.13, B2.1 Date: 07/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
July 25, 2013NETL Morgantown Pavilion
CX(s) Applied: B1.13, B2.1
Date: 07/25/2013
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory
Construction of a new concrete slab and pavilion, replacement of existing concrete sidewalk next to new pavilion area, and installation of a new storm water catch basin next to new pavilion area.
CX(s) Applied: B1.13, B2.1
Date: 07/25/2013
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory
Construction of a new concrete slab and pavilion, replacement of existing concrete sidewalk next to new pavilion area, and installation of a new storm water catch basin next to new pavilion area.