Test Reactor Area (TRA)-670 Control Room Break Room and 2nd Basement Bathroom Modification CX(s) Applied: B2.1Date: 01/07/2016 Location(s): IdahoOffices(s): Nuclear Energy
Office of NEPA Policy and Compliance
January 7, 2016Test Reactor Area (TRA)-670 Control Room Break Room and 2nd Basement Bathroom Modification
CX(s) Applied: B2.1
Date: 01/07/2016
Location(s): Idaho
Offices(s): Nuclear Energy
The sewer system associated with the TRA-670 2nd basement restroom does not work properly. The piping leaks, does not drain properly, and sewer gas odor is present. To fix this, the sewer system has been re-designed to have the proper number of vents, piping size, and functioning components.