Bonneville Power Administration (BPA) proposes to replace the 4 GHz digital radio equipment system from Prospect Hill Radio Station (PROH) to Mario…
Paint walls, doors, and trim in room 5 at 284-7H.…
Subcontractor will repair the roof at 773-42A. The Subcontractor will not disturb the existing roof on 773-42A.…
D and R the abandoned heat recovery coil in the fan supply unit located in building 735-11A, Room 201.…
The project will replace the heating, ventilation, and air conditioning equipment, including the Energy Recovery Unit (ERU) and selective heat pumps (15). The Evaporative Cooler will also be replaced.
Replacement of the DFT is required in order to minimize the potential for interruptions to the steam service at KS.
The scope of work includes reconfiguring the space for the new use, upgrading the HVAC system, the electrical, lighting systems, and the telecommunication system.
Drill cylinder holes in doors to accept lock cylinder and install emergency exit device and trim. This work requires access to both sides of the do…
Correct broken portion of existing well access bridge for HPZ 003A well at H-Base Injection. Bridge is located in a soil contamination area.…
Confined Space Mock-up Trainer Modifications in Room 1056 of Building 766-H.…