Conduct routine inspections, monitoring, and maintenance activities throughout the year at the Sherwood, WA, Disposal Site based on best management…
703-46A: Replace carpet in offices 215, 217, 226, 232 and 235. Prep/Paint and wallpaper repair will be in offices 214 and 222. Paint room 107.…
Subcontractor will provide roof repairs at 722-5A.…
722-5A Paint hallway.…
Subcontractor will provide roof repairs at 703-44A.…
Dominion Energy SC (DESC) will replace the fence around the switchyard at 151-1L.…
The Defense Waste Processing Facility (DWPF) Weld Test Cell camera is to be replaced.…
Installation of blanks between existing flanges downstream of valve 171-7 and 171-8. REV 1 will also cover the cleaning out of the tank by vacuum t…
Maintenance to install a pair of eye bolts on door 410 North for Admin Seal applications.…
This EEC covers all flushing, inspections, and maintenance of the fire water systems across the SRS.…