The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts transmission and distribution line structure replacements in se…
This project is needed to repair Section L-8 of the X-204 Rail system.…
Bonneville Power Administration (BPA) proposes to perform landing work and insulator replacement on Chief Joseph – Monroe No. 1 structure 43/6 in t…
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts vegetation management activities within existing transmission a…
To maintain reliable power to the region, Bonneville Power Administration (BPA) proposes to replace a wood structure in line mile 14 with a steel m…
The US Department of Energy (DOE) proposes to perform mechanical replacements and/or upgrades of the Advanced Light Source (ALS) switchstation A3 (…
Subcontractor will perform a core sampling of roofs Buildings 232-H, 264-H, and 264-2H with the SRS asbestos group. Sampling locations will be patc…
Replace Nitrogen Pressure Safety Valves (PSV's) per preventive maintenance work packages.…
The Furnace 100 Process Chilled Water has been shown to be overly acidic for its process function and needs to be drained.…
Sanitary Waste Treatment Facility-Re-coat Concrete Surface in the UV Channel and Cascade System.…