Remove current air compressor, Compressed air dryer and necessary piping. Install New Air compressor, two Compressed air dryers and necessary pipin…
The EEC covers the sealing of windows and roof of 711-6N.…
Maintenance Dredging of River Water Intake Canal 681-3G.…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform routine maintenance activities and custodial services for buildings, …
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform routine maintenance activities and custodial services for buildings, structu…
Grading of the exterior of 760-11G and the installation of a drainage system, to prevent further water intrusion.…
The site plans to complete additional roadway resurfacing on Road C this FY '24 (likely around the Mar/Apr timeframe). The section of roadway from …
The 151-1C and 151-2C substation batteries and battery racks will be replaced due to age and the batteries being obsolete.…
Replace All Non-Emergency Light Fixtures at 730-2B.…
This EEC covers all excavation work activities at SRS when it has been determined that a CERCLA O and M Plan is required. These excavation activiti…