The Furnace 100 Process Chilled Water has been shown to be overly acidic for its process function and needs to be drained.…
Sanitary Waste Treatment Facility-Re-coat Concrete Surface in the UV Channel and Cascade System.…
Site construction will regrade the ditch along side building 713-3N to prevent water intrusion…
617-G Replace floor tiles.…
Scope-Clean oil spill in 715-3N fuel dike and repair pressure control device.…
789-B Repave Driveway…
Repair and seal the south wall of 713-3N.…
Installation of blanks between existing flanges downstream of valve 171-7 and 171-8. …
Paint 158B Panel at 281-2H.…
Remove/replace broken windows.…