Remove concrete and metal post to a minimum of 2 inches below grade prep area and apply asphalt to restore the area back to its normal configuratio…
Bonneville Power Administration (BPA) proposes to provide funding to the Oregon Department of Fish and Wildlife to conduct routine well maintenance…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Blue Mesa-Skito …
BPA proposes to provide funding to the Confederated Tribes of the Yakama Nations to conduct annual routine maintenance activities at the Melvin R. …
BPA proposes to replace ten structures and improve access roads on the Dorena Tap to Alvey-Martin Creek No. 1, Eugene-Alvey No. 2, Lane-Fairview Fi…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at specific l…
Bonneville Power Administration (BPA) proposes to replace portions of the roof drainage system at BPA’s untanking tower located at the Chehalis Sub…
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts transmission and distribution line structure replacements in se…
The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts vegetation management activities within existing transmission a…
The Bonneville Power Administration (BPA) is proposing to replace facility entry signs at several BPA substations and maintenance headquarters (MHQ…