Paint areas at 705-3C.…
702-A Exterior Wall Repair.…
Replace carpet in 708-1B room 132, Centerra.…
Subcontractor will provide a roof replacement at 731-2N.…
Rinse, seal and paint exterior walls on buildings as listed in the detailed descripition.…
Scope-Replace Pump Motors, Wiring, and Pipe Nipple at 715-3N…
Proposed activity is Work Order 1814974, 73E Repair-Replace Door Frame for E-055 Entrance, which will repair or replace the door and door frame bet…
Two vessels (TK 7.5 and TK 17.3) will need to be configured with a new SpG transmitter and a new liquid level-SpG jumper.…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
Bonneville Power Administration (BPA) proposes to improve approximately 4,000 linear feet of existing access road leading to the BPA Indian Mountai…