Twenty deuterium cylinders in Cylinder Shed No. 6 will be de-pinned, de-valved and evacuated to the 234-H Stack.…
The process sewer associated with HP-50 will be smoke tested as a facility maintenance activity.…
This EEC covers various routine maintenance activities that occur in the buildings within the SRPPF Complex Area.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Vernal-Hayden (V…
Bonneville Power Administration (BPA) proposes to replace structure 3/12 on the Lookout Point-Alvey No. 1 transmission line near Lowell, Lane Count…
Insulation Repairs for 731-1N, 2N, 3N and 4N.…
719-5N Replace carpet in office No. 309A.…
Upgrade 2nd Floor Wiring in 713-1N to CAT-5.…
Rinse, seal, and paint exterior walls on buildings as listed in the detailed descripition.…
Apply cool seal (Ames Maximum Stretch Coating) to trailer roofs 704-37G, 782-3G, 735-9G, 735-10G, 704-22G, 617-3G, 704-23G, 704-24G, 704-25G, and 7…