Site Characterization, Monitoring, and General Research Activities for Pantex Plant for FY 2014 CX(s) Applied: B3.1, B3.3, B3.6, B3.8 Date: 09/26/2013 Location(s): Texas Offices(s): Pantex Site Office
Ion Advanced Solvent Carbon Dioxide Capture Pilot Project CX(s) Applied: B3.6 Date: 09/26/2013 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Ion Advanced Solvent Carbon Dioxide Capture Pilot Project CX(s) Applied: A9, A11 Date: 09/26/2013 Location(s): North Dakota Offices(s): National Energy Technology Laboratory
Ion Advanced Solvent Carbon Dioxide Capture Pilot Project CX(s) Applied: B3.6 Date: 09/26/2013 Location(s): Colorado Offices(s): National Energy Technology Laboratory
I-75 Green Corridor Project CX(s) Applied: A1, B5.2, B5.22 Date: 09/26/2013 Location(s): Florida Offices(s): National Energy Technology Laboratory
Mechanisms for Methane Transport and Hydrate Accumulation in Coarse-Grained Sediments CX(s) Applied: A9 Date: 09/26/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Advanced Acid Gas Separation Technology for Clean Power and Syngas Applications CX(s) Applied: B3.6 Date: 09/26/2013 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Artesia Tap- Southwest Rangely 138 Kilovolt Transmission Line Danger Tree and Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Subcontractor Repair of Roof Leaks at 720-H CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Advanced Acid Gas Separation Technology for Clean Power and Syngas Applications CX(s) Applied: B3.6 Date: 09/26/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory