Area 1: Systematic Assessment of Wellbore Integrity for Geologic Carbon Storage Projects CX(s) Applied: B3.1 Date: 09/30/2013 Location(s): Ohio Offices(s): National Energy Technology Laboratory
Echo Lake Substation Isolation Disconnect Switch Installation CX(s) Applied: B4.6 Date: 09/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Idaho National Laboratory Road Sign Installation/Maintenance CX(s) Applied: B1.32 Date: 09/27/2013 Location(s): Idaho Offices(s): Idaho Operations Office
“Nanite” For Better Well-Bore Integrity and Zonal Isolation CX(s) Applied: B3.6 Date: 09/27/2013 Location(s): Hawaii Offices(s): National Energy Technology Laboratory
Chemawa-Salem #1 & #2 Access Roads CX(s) Applied: B1.3 Date: 09/27/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Safety, Health, and Environmental Improvements for FY2014 and FY2015 CX(s) Applied: B2.1, B2.2, B2.3, B2.5 Date: 09/26/2013 Location(s): Texas Offices(s): Pantex Site Office
Site Characterization, Monitoring, and General Research Activities for Pantex Plant for FY 2014 CX(s) Applied: B3.1, B3.3, B3.6, B3.8 Date: 09/26/2013 Location(s): Texas Offices(s): Pantex Site Office
Ion Advanced Solvent Carbon Dioxide Capture Pilot Project CX(s) Applied: B3.6 Date: 09/26/2013 Location(s): Alabama Offices(s): National Energy Technology Laboratory
Ion Advanced Solvent Carbon Dioxide Capture Pilot Project CX(s) Applied: A9, A11 Date: 09/26/2013 Location(s): North Dakota Offices(s): National Energy Technology Laboratory
Ion Advanced Solvent Carbon Dioxide Capture Pilot Project CX(s) Applied: B3.6 Date: 09/26/2013 Location(s): Colorado Offices(s): National Energy Technology Laboratory