Hydro Research Foundation University Research Awards - University of Tennessee CX(s) Applied: B3.3 Date: 06/18/2014 Location(s): Tennessee Offices(s): Golden Field Office
Process Water Instrument Air System Reconfiguration at 284-H CX(s) Applied: B1.3Date: 41808 Location(s): South CarolinaOffices(s): Savannah River Operations Office
FRAPPE and DISCOVER-AQ Experiments CX(s) Applied: A9, A11, B3.1 Date: 06/17/2014 Location(s): Colorado Offices(s): Golden Field Office
Lease Extension for Parcels of Land Within the Boundaries of Lawrence Berkeley National Laboratory CX(s) Applied: B1.24Date: 41807 Location(s): CaliforniaOffices(s): Berkeley Site Office
Deer Park Substation Connection Modifications CX(s) Applied: B4.11 Date: 06/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Remove Two Sets of Railroad Tracks on Road D in A-Area CX(s) Applied: B1.3Date: 41807 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773-A, C150 CX(s) Applied: B3.6Date: 41807 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of a Concrete Pad East of Building 241-149H CX(s) Applied: B1.15Date: 41807 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Hayden-Vernal 138-kilovolt Transmission Line Road Maintenance and Structure Replacements, Uintah County, Utah CX(s) Applied: B1.3 Date: 06/17/2014 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region
Southwestern Power Administration proposes to construct two berms inside the station and spread new gravel.…